Audi Q3 Owners & Service Manuals

Audi Q3: General, Technical data

Safety Precautions

Safety Precautions when Working on Start/Stop System

Pay Attention to the Following when Working On Vehicles with a Start/Stop System:

  WARNING

Danger of personal injury when the engine starts automatically.

  • When the Start/Stop System is activated (recognizable by a message in the instrument cluster), the engine can start up automatically if necessary.
  • Make sure the Start/Stop System is deactivated whenever working on the vehicle (switch off ignition; switch it on again if needed).

Safety Precautions during Road Test with Testing Equipment

Pay Attention to the Following if it is Necessary to Use Testing Equipment During A Road Test:

  WARNING

Distraction and improperly secured testing equipment poses an accident risk.

There is a risk due to the front passenger airbag deploying in an accident.

  • Operating testing equipment while driving creates a distraction.
  • There is an increased risk of personal injury if testing equipment is not secured.

Always secure testing equipment with a strap on the rear seat and have a second person on the rear seat operate it.

    READ NEXT:

     Infotainment System

     Overview - Infotainment System

    MMI Navigation Plus, 7T6 Information Electronics Control Module 1 -J794- with DVD player/SD card reader/navigation system integrated in the instrument panel Internal hard drive memory (HDD)

     Infotainment System Display, Removing and Installing

    Infotainment System Display, Removing and Installing The Front Information Display Control Head -J685- (Display) is located in the center of the instrument panel. The display and display support a

    SEE MORE:

     LED and battery in the remote control key

    Fig. 27 Remote control key (rear side): opening the cover LED on the remote control key The LED in the remote control key (front side) indicates the status of the key. If you press a button briefly, the LED blinks once. If you press and hold a button (convenience opening/closing), the LED blin

     Roof Bars/Roof Rails

    Overview - Roof Railing 1 - Nut Quantity: 4 Install with locking compound. For the correct locking compound, refer to the Parts Catalog. Tightening sequence. Refer to → Fig. "Roof Rail - Tightening Specification and Sequence" 2 - Balancing Element Quan